Manufacturing · Production dashboards

We connect your machines, shop-floor entries and ERP into dashboards that show output, downtime and order status as it happens. You and your supervisors act on the same numbers, during the shift.

Example plantShakti Forgings, Rajkot · Line A
Floor screenShift B · 14:20
Avail. 94%× Perf. 91%× Quality 99%85%
Parts made 2,410Plan to now 2,480
No stoppages this hourOEE

↓Machine stack lights feed a read-only gateway, then the floor screen; each loop a different plant and stoppage

Signs you need it

Heard yourself say this?Count how many fit.

Five things owners tell us before a project like this starts. Every one you recognise adds a tally mark.

Your tally0of 5

Tap the lines you have said this year.

In plain words

Production dashboards,explained without jargon.

How does a live production dashboard get its numbers?

One idea at a time. Each sheet lays over the last, so the picture builds up. Tap a number to jump.

Think of it like this

It works like a car's instrument panel, built for the whole factory.

01 / 04

Most modern machines are controlled by a PLC that already knows when it is running, stopped or faulted and how many parts it has made.

02 / 04

A small gateway reads those signals through standard protocols such as OPC UA or MQTT and sends them to a database.

03 / 04

Older machines can be fitted with simple sensors or an operator tablet for entries.

04 / 04

The dashboard combines these signals with orders and plans from your ERP and shows them on screens and phones.

What you receive

Six parts,all handed over to you.

Your Production dashboards work is made of these six parts. The comb lights each one in turn; tap a cell to read it.

Production dashboards
Part 01 of 06

Site and signal survey

We list every machine, its controller make and model, available network ports and what data it can share. You get a plain report of which machines connect directly and which need sensors or manual entry.

  • Site and signal survey
  • Data collection gateway
  • Operator entry screens
  • Live plant and line dashboards
  • OEE and loss reports
  • ERP link and alerts
An example

Picture a business like yours,in three frames.

A typical situation, not a client story. The line in each frame goes from tangled to straight as the work is done.

A Chakan auto component plant supplying tier one customers

How it runs

Four legs of one relay,about 12 weeks, start to finish.

Each leg is sized by how long it usually takes. Watch the baton go round, or tap a leg to jump there.

Leg 1 of 4Week 1 to 2Survey the floor
What shapes the quote

Four factors,four corners of your project.

Each corner grows when that factor is on the larger side. The outline is your project's footprint, and the quote follows it.

Footprint

A compact project. The smallest footprint for your quote.

The decision

The question we hear most:Connect machines directly or start with operator entries?

The board turns through each option. Tap one to hold it and read the trade-off.

Pick this when

Your machines have PLCs with accessible network ports and you want counts and stoppages without human input.

The trade-off

It needs a site survey, sometimes help from the machine supplier, and more set-up time.

Common mistakes

Four things that trip a project,and the fix we fit instead.

Each fuse is a mistake we see often. Watch it blow and get replaced, or tap a fuse to read the fix.

Trips when

Putting machines on the office network with open access

How we avoid it

Keep machines on a separate network segment and let the gateway read data outward only, with your IT team reviewing the setup.

Production dashboards questions,answered plainly.

Search the answers. If yours is missing, ask us on the call.

Cost & timeHow long does a production dashboard take and what affects the cost?

Most projects take 6 to 12 weeks after the site survey. Cost depends on how many machines you connect, how old and varied their controllers are, the state of your floor network and how deeply it links to your ERP. We give you a fixed quote after the survey, within 48 hours.

Getting startedCan it read data from old machines?

Often yes. Machines without accessible PLCs can be fitted with a sensor on the cycle signal or a current sensor to detect running and stopped states. Where that is impractical, operators log output on a tablet.

Getting startedWill connecting machines affect production or warranties?

The gateway only reads data and does not change machine programs. Some machine suppliers want to be informed before anyone connects to their controller, so we check your warranty terms with you first and involve the supplier where needed.

Getting startedIs our machine data safe?

Data travels outward from a gateway on a separate network, encrypted to servers in an account you own. We follow common industrial security practice, and your IT team or adviser should review the design before go-live.

Getting startedDo we need an MES?

Not always. Many MSMEs get most of what they need from machine monitoring, downtime capture and ERP-linked work orders. If you later need full traceability or electronic batch records, the data foundation carries over.

Getting startedCan we see dashboards on a phone?

Yes. Owners and plant heads get a mobile view with the same live figures and alerts on WhatsApp or email when a line stops longer than a set time. Access is controlled by role.

OwnershipWho owns the data, code and hardware?

You own the gateways, the software, the cloud account and all production data. We document the tag list and setup so another team can maintain it if you choose.

After launchWhat happens after launch?

A monthly care plan covers monitoring of gateways and data flow, new machines and reports and fixes. If data stops arriving, we get an alert and respond within one working day.

Next step

Run today's shift on today's numbers

Share a list of your machines and controllers, and we will reply within 1 working day with what a pilot line could look like.